# Syndarix Implementation Roadmap **Version:** 1.0 **Date:** 2025-12-29 **Status:** Draft --- ## Executive Summary This roadmap outlines the phased implementation approach for Syndarix, prioritizing foundational infrastructure before advanced features. Each phase builds upon the previous, with clear milestones and deliverables. --- ## Phase 0: Foundation (Weeks 1-2) **Goal:** Establish development infrastructure and basic platform ### 0.1 Repository Setup - [x] Fork PragmaStack to Syndarix - [x] Create spike backlog in Gitea - [x] Complete architecture documentation - [ ] Rebrand codebase (Issue #13 - in progress) - [ ] Configure CI/CD pipelines - [ ] Set up development environment documentation ### 0.2 Core Infrastructure - [ ] Configure Redis for cache + pub/sub - [ ] Set up Celery worker infrastructure - [ ] Configure pgvector extension - [ ] Create MCP server directory structure - [ ] Set up Docker Compose for local development ### Deliverables - Fully branded Syndarix repository - Working local development environment - CI/CD pipeline running tests --- ## Phase 1: Core Platform (Weeks 3-6) **Goal:** Basic project and agent management without LLM integration ### 1.1 Data Model - [ ] Create Project entity and CRUD - [ ] Create AgentType entity and CRUD - [ ] Create AgentInstance entity and CRUD - [ ] Create Issue entity with external tracker fields - [ ] Create Sprint entity and CRUD - [ ] Database migrations with Alembic ### 1.2 API Layer - [ ] Project management endpoints - [ ] Agent type configuration endpoints - [ ] Agent instance management endpoints - [ ] Issue CRUD endpoints - [ ] Sprint management endpoints ### 1.3 Real-time Infrastructure - [ ] Implement EventBus with Redis Pub/Sub - [ ] Create SSE endpoint for project events - [ ] Implement event types enum - [ ] Add keepalive mechanism - [ ] Client-side SSE handling ### 1.4 Frontend Foundation - [ ] Project dashboard page - [ ] Agent configuration UI - [ ] Issue list and detail views - [ ] Real-time activity feed component - [ ] Basic navigation and layout ### Deliverables - CRUD operations for all core entities - Real-time event streaming working - Basic admin UI for configuration --- ## Phase 2: MCP Integration (Weeks 7-10) **Goal:** Build MCP servers for external integrations ### 2.1 MCP Client Infrastructure - [ ] Create MCPClientManager class - [ ] Implement server registry - [ ] Add connection management with reconnection - [ ] Create tool call routing ### 2.2 LLM Gateway MCP (Priority 1) - [ ] Create FastMCP server structure - [ ] Implement LiteLLM integration - [ ] Add model group routing - [ ] Implement failover chain - [ ] Add cost tracking callbacks - [ ] Create token usage logging ### 2.3 Knowledge Base MCP (Priority 2) - [ ] Create pgvector schema for embeddings - [ ] Implement document ingestion pipeline - [ ] Create chunking strategies (code, markdown, text) - [ ] Implement semantic search - [ ] Add hybrid search (vector + keyword) - [ ] Per-project collection isolation ### 2.4 Git MCP (Priority 3) - [ ] Create Git operations wrapper - [ ] Implement clone, commit, push operations - [ ] Add branch management - [ ] Create PR operations - [ ] Add Gitea API integration - [ ] Implement GitHub/GitLab adapters ### 2.5 Issues MCP (Priority 4) - [ ] Create issue sync service - [ ] Implement Gitea issue operations - [ ] Add GitHub issue adapter - [ ] Add GitLab issue adapter - [ ] Implement bi-directional sync - [ ] Create conflict resolution logic ### Deliverables - 4 working MCP servers - LLM calls routed through gateway - RAG search functional - Git operations working - Issue sync with external trackers --- ## Phase 3: Agent Orchestration (Weeks 11-14) **Goal:** Enable agents to perform autonomous work ### 3.1 Agent Runner - [ ] Create AgentRunner class - [ ] Implement context assembly - [ ] Add memory management (short-term, long-term) - [ ] Implement action execution - [ ] Add tool call handling - [ ] Create agent error handling ### 3.2 Agent Orchestrator - [ ] Implement spawn_agent method - [ ] Create terminate_agent method - [ ] Implement send_message routing - [ ] Add broadcast functionality - [ ] Create agent status tracking - [ ] Implement agent recovery ### 3.3 Inter-Agent Communication - [ ] Define message format schema - [ ] Implement message persistence - [ ] Create message routing logic - [ ] Add @mention parsing - [ ] Implement priority queues - [ ] Add conversation threading ### 3.4 Background Task Integration - [ ] Create Celery task wrappers - [ ] Implement progress reporting - [ ] Add task chaining for workflows - [ ] Create agent queue routing - [ ] Implement task retry logic ### Deliverables - Agents can be spawned and communicate - Agents can call MCP tools - Background tasks for long operations - Agent activity visible in real-time --- ## Phase 4: Workflow Engine (Weeks 15-18) **Goal:** Implement structured workflows for software delivery ### 4.1 State Machine Foundation - [ ] Create workflow state machine base - [ ] Implement state persistence - [ ] Add transition validation - [ ] Create state history logging - [ ] Implement compensation patterns ### 4.2 Core Workflows - [ ] Requirements Discovery workflow - [ ] Architecture Spike workflow - [ ] Sprint Planning workflow - [ ] Story Implementation workflow - [ ] Sprint Demo workflow ### 4.3 Approval Gates - [ ] Create approval checkpoint system - [ ] Implement approval UI components - [ ] Add notification triggers - [ ] Create timeout handling - [ ] Implement escalation logic ### 4.4 Autonomy Levels - [ ] Implement FULL_CONTROL mode - [ ] Implement MILESTONE mode - [ ] Implement AUTONOMOUS mode - [ ] Create autonomy configuration UI - [ ] Add per-action approval overrides ### Deliverables - Structured workflows executing - Approval gates working - Autonomy levels configurable - Full sprint cycle possible --- ## Phase 5: Advanced Features (Weeks 19-22) **Goal:** Polish and production readiness ### 5.1 Cost Management - [ ] Real-time cost tracking dashboard - [ ] Budget configuration per project - [ ] Alert threshold system - [ ] Cost optimization recommendations - [ ] Historical cost analytics ### 5.2 Audit & Compliance - [ ] Comprehensive action logging - [ ] Audit trail viewer UI - [ ] Export functionality - [ ] Retention policy implementation - [ ] Compliance report generation ### 5.3 Human-Agent Collaboration - [ ] Live activity dashboard - [ ] Intervention panel (pause, guide, undo) - [ ] Agent chat interface - [ ] Context inspector - [ ] Decision explainer ### 5.4 Additional MCP Servers - [ ] File System MCP - [ ] Code Analysis MCP - [ ] CI/CD MCP ### Deliverables - Production-ready system - Full observability - Cost controls active - Audit compliance --- ## Phase 6: Polish & Launch (Weeks 23-24) **Goal:** Production deployment ### 6.1 Performance Optimization - [ ] Load testing - [ ] Query optimization - [ ] Caching optimization - [ ] Memory profiling ### 6.2 Security Hardening - [ ] Security audit - [ ] Penetration testing - [ ] Secrets management - [ ] Rate limiting tuning ### 6.3 Documentation - [ ] User documentation - [ ] API documentation - [ ] Deployment guide - [ ] Runbook ### 6.4 Deployment - [ ] Production environment setup - [ ] Monitoring & alerting - [ ] Backup & recovery - [ ] Launch checklist --- ## Risk Register | Risk | Impact | Probability | Mitigation | |------|--------|-------------|------------| | LLM API outages | High | Medium | Multi-provider failover | | Cost overruns | High | Medium | Budget enforcement, local models | | Agent hallucinations | High | Medium | Approval gates, code review | | Performance bottlenecks | Medium | Medium | Load testing, caching | | Integration failures | Medium | Low | Contract testing, mocks | --- ## Success Metrics | Metric | Target | Measurement | |--------|--------|-------------| | Agent task success rate | >90% | Completed tasks / total tasks | | Response time (P95) | <2s | API latency | | Cost per project | <$50/sprint | LLM + compute costs | | Time to first commit | <1 hour | From requirements to PR | | Client satisfaction | >4/5 | Post-sprint survey | --- ## Dependencies ``` Phase 0 ─────▶ Phase 1 ─────▶ Phase 2 ─────▶ Phase 3 ─────▶ Phase 4 ─────▶ Phase 5 ─────▶ Phase 6 Foundation Core Platform MCP Integration Agent Orch Workflows Advanced Launch │ │ Depends on: - LLM Gateway - Knowledge Base - Real-time events ``` --- ## Resource Requirements ### Development Team - 1 Backend Engineer (Python/FastAPI) - 1 Frontend Engineer (React/Next.js) - 0.5 DevOps Engineer - 0.25 Product Manager ### Infrastructure - PostgreSQL (managed or self-hosted) - Redis (managed or self-hosted) - Celery workers (2-4 instances) - MCP servers (7 containers) - API server (2+ instances) - Frontend (static hosting or SSR) ### External Services - Anthropic API (primary LLM) - OpenAI API (fallback) - Ollama (local models, optional) - Gitea/GitHub/GitLab (issue tracking) --- *This roadmap will be refined as spikes complete and requirements evolve.*