forked from cardosofelipe/fast-next-template
- Mark Phase 1 as 100% complete - Update all Phase 1 sections to show completion - Close blocking items section (all issues resolved) - Add next steps for Phase 2-4 - Update dependencies diagram 🤖 Generated with [Claude Code](https://claude.com/claude-code) Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
386 lines
12 KiB
Markdown
386 lines
12 KiB
Markdown
# Syndarix Implementation Roadmap
|
|
|
|
**Version:** 1.3
|
|
**Date:** 2025-12-31
|
|
**Status:** Active Development
|
|
|
|
---
|
|
|
|
## Executive Summary
|
|
|
|
This roadmap outlines the phased implementation approach for Syndarix, prioritizing foundational infrastructure before advanced features. Each phase builds upon the previous, with clear milestones and deliverables.
|
|
|
|
---
|
|
|
|
## Phase 0: Foundation ✅ COMPLETE
|
|
**Goal:** Establish development infrastructure and basic platform
|
|
|
|
### 0.1 Repository Setup
|
|
- [x] Fork PragmaStack to Syndarix
|
|
- [x] Create spike backlog in Gitea (12 issues)
|
|
- [x] Complete architecture documentation
|
|
- [x] Complete all spike research (SPIKE-001 through SPIKE-012)
|
|
- [x] Create all ADRs (ADR-001 through ADR-014)
|
|
- [x] Rebrand codebase (all URLs, names, configs updated)
|
|
- [x] Configure CI/CD pipelines (`.gitea/workflows/ci.yaml`)
|
|
- [x] Set up development environment documentation
|
|
|
|
### 0.2 Core Infrastructure
|
|
- [x] Configure Redis for cache + pub/sub (`app/core/redis.py`)
|
|
- [x] Set up Celery worker infrastructure (4 queues: agent, git, sync, cicd)
|
|
- [x] Configure pgvector extension (migration 0003)
|
|
- [x] Create MCP server directory structure (`mcp-servers/`)
|
|
- [x] Set up Docker Compose for local development (3 compose files)
|
|
|
|
### Deliverables
|
|
- [x] Fully branded Syndarix repository
|
|
- [x] Complete architecture documentation (ARCHITECTURE.md)
|
|
- [x] All spike research completed (12 spikes)
|
|
- [x] All ADRs documented (14 ADRs)
|
|
- [x] Working local development environment (Docker Compose)
|
|
- [x] CI/CD pipeline running tests
|
|
|
|
---
|
|
|
|
## Phase 1: Core Platform ✅ COMPLETE
|
|
**Goal:** Basic project and agent management without LLM integration
|
|
|
|
### 1.1 Data Model ✅ COMPLETE
|
|
- [x] Create Project entity and CRUD (`models/syndarix/project.py`)
|
|
- [x] Create AgentType entity and CRUD (`models/syndarix/agent_type.py`)
|
|
- [x] Create AgentInstance entity and CRUD (`models/syndarix/agent_instance.py`)
|
|
- [x] Create Issue entity with external tracker fields (`models/syndarix/issue.py`)
|
|
- [x] Create Sprint entity and CRUD (`models/syndarix/sprint.py`)
|
|
- [x] Database migrations with Alembic (3 migrations)
|
|
|
|
### 1.2 API Layer ✅ COMPLETE
|
|
- [x] Project management endpoints (`api/routes/projects.py`) - Issue #28
|
|
- [x] Agent type configuration endpoints (`api/routes/agent_types.py`) - Issue #29
|
|
- [x] Agent instance management endpoints (`api/routes/agents.py`) - Issue #30
|
|
- [x] Issue CRUD endpoints (`api/routes/issues.py`) - Issue #31
|
|
- [x] Sprint management endpoints (`api/routes/sprints.py`) - Issue #32
|
|
|
|
### 1.3 Real-time Infrastructure ✅ COMPLETE
|
|
- [x] Implement EventBus with Redis Pub/Sub (`services/event_bus.py`)
|
|
- [x] Create SSE endpoint for project events (`api/routes/events.py`)
|
|
- [x] Implement event types enum (`schemas/events.py`)
|
|
- [x] Add keepalive mechanism
|
|
- [x] Client-side SSE handling (`hooks/useProjectEvents.ts`)
|
|
|
|
### 1.4 Frontend Foundation ✅ COMPLETE
|
|
- [x] Project dashboard page (prototype + implementation) - #36, #40
|
|
- [x] Agent configuration UI (prototype + implementation) - #37, #41
|
|
- [x] Issue list and detail views (prototype + implementation) - #38, #42
|
|
- [x] Real-time activity feed component (prototype + implementation) - #39, #43
|
|
- [x] Basic navigation and layout (implemented)
|
|
|
|
### 1.5 Main Dashboard & Onboarding ✅ COMPLETE
|
|
- [x] Main Dashboard / Projects List (design + implementation) - #47, #48
|
|
- [x] Project Creation Wizard (design + implementation) - #49, #50
|
|
|
|
**Note:** The Project Creation Wizard includes a placeholder for Phase 4 agent chat integration.
|
|
Full onboarding workflow (FR-301, FR-302) will be implemented in Phase 4.
|
|
|
|
### Deliverables
|
|
- [x] CRUD operations for all core entities
|
|
- [x] Real-time event streaming working
|
|
- [x] Admin UI for agent type configuration
|
|
- [x] Main dashboard with projects list and activity feed
|
|
- [x] Project creation wizard (simplified, no agent chat)
|
|
|
|
---
|
|
|
|
## Phase 2: MCP Integration (Weeks 7-10)
|
|
**Goal:** Build MCP servers for external integrations
|
|
|
|
### 2.1 MCP Client Infrastructure
|
|
- [ ] Create MCPClientManager class
|
|
- [ ] Implement server registry
|
|
- [ ] Add connection management with reconnection
|
|
- [ ] Create tool call routing
|
|
|
|
### 2.2 LLM Gateway MCP (Priority 1)
|
|
- [x] Create FastMCP server structure (`mcp-servers/llm-gateway/`)
|
|
- [ ] Implement LiteLLM integration
|
|
- [ ] Add model group routing
|
|
- [ ] Implement failover chain
|
|
- [ ] Add cost tracking callbacks
|
|
- [ ] Create token usage logging
|
|
|
|
### 2.3 Knowledge Base MCP (Priority 2)
|
|
- [x] Create server directory (`mcp-servers/knowledge-base/`)
|
|
- [ ] Create pgvector schema for embeddings
|
|
- [ ] Implement document ingestion pipeline
|
|
- [ ] Create chunking strategies (code, markdown, text)
|
|
- [ ] Implement semantic search
|
|
- [ ] Add hybrid search (vector + keyword)
|
|
- [ ] Per-project collection isolation
|
|
|
|
### 2.4 Git MCP (Priority 3)
|
|
- [x] Create server directory (`mcp-servers/git-ops/`)
|
|
- [ ] Create Git operations wrapper
|
|
- [ ] Implement clone, commit, push operations
|
|
- [ ] Add branch management
|
|
- [ ] Create PR operations
|
|
- [ ] Add Gitea API integration
|
|
- [ ] Implement GitHub/GitLab adapters
|
|
|
|
### 2.5 Issues MCP (Priority 4)
|
|
- [x] Create server directory (`mcp-servers/issues/`)
|
|
- [ ] Create issue sync service
|
|
- [ ] Implement Gitea issue operations
|
|
- [ ] Add GitHub issue adapter
|
|
- [ ] Add GitLab issue adapter
|
|
- [ ] Implement bi-directional sync
|
|
- [ ] Create conflict resolution logic
|
|
|
|
### Deliverables
|
|
- 4 working MCP servers
|
|
- LLM calls routed through gateway
|
|
- RAG search functional
|
|
- Git operations working
|
|
- Issue sync with external trackers
|
|
|
|
---
|
|
|
|
## Phase 3: Agent Orchestration (Weeks 11-14)
|
|
**Goal:** Enable agents to perform autonomous work
|
|
|
|
### 3.1 Agent Runner
|
|
- [ ] Create AgentRunner class
|
|
- [ ] Implement context assembly
|
|
- [ ] Add memory management (short-term, long-term)
|
|
- [ ] Implement action execution
|
|
- [ ] Add tool call handling
|
|
- [ ] Create agent error handling
|
|
|
|
### 3.2 Agent Orchestrator
|
|
- [ ] Implement spawn_agent method
|
|
- [ ] Create terminate_agent method
|
|
- [ ] Implement send_message routing
|
|
- [ ] Add broadcast functionality
|
|
- [ ] Create agent status tracking
|
|
- [ ] Implement agent recovery
|
|
|
|
### 3.3 Inter-Agent Communication
|
|
- [ ] Define message format schema
|
|
- [ ] Implement message persistence
|
|
- [ ] Create message routing logic
|
|
- [ ] Add @mention parsing
|
|
- [ ] Implement priority queues
|
|
- [ ] Add conversation threading
|
|
|
|
### 3.4 Background Task Integration
|
|
- [x] Create Celery task wrappers (`app/tasks/`)
|
|
- [x] Implement retry logic with exponential backoff
|
|
- [ ] Implement progress reporting
|
|
- [ ] Add task chaining for workflows
|
|
- [ ] Create agent queue routing
|
|
|
|
### Deliverables
|
|
- Agents can be spawned and communicate
|
|
- Agents can call MCP tools
|
|
- Background tasks for long operations
|
|
- Agent activity visible in real-time
|
|
|
|
---
|
|
|
|
## Phase 4: Workflow Engine (Weeks 15-18)
|
|
**Goal:** Implement structured workflows for software delivery
|
|
|
|
### 4.1 State Machine Foundation
|
|
- [ ] Create workflow state machine base
|
|
- [ ] Implement state persistence
|
|
- [ ] Add transition validation
|
|
- [ ] Create state history logging
|
|
- [ ] Implement compensation patterns
|
|
|
|
### 4.2 Core Workflows
|
|
- [ ] Requirements Discovery workflow
|
|
- [ ] Architecture Spike workflow
|
|
- [ ] Sprint Planning workflow
|
|
- [ ] Story Implementation workflow
|
|
- [ ] Sprint Demo workflow
|
|
|
|
### 4.3 Approval Gates
|
|
- [ ] Create approval checkpoint system
|
|
- [ ] Implement approval UI components
|
|
- [ ] Add notification triggers
|
|
- [ ] Create timeout handling
|
|
- [ ] Implement escalation logic
|
|
|
|
### 4.4 Autonomy Levels
|
|
- [ ] Implement FULL_CONTROL mode
|
|
- [ ] Implement MILESTONE mode
|
|
- [ ] Implement AUTONOMOUS mode
|
|
- [ ] Create autonomy configuration UI
|
|
- [ ] Add per-action approval overrides
|
|
|
|
### Deliverables
|
|
- Structured workflows executing
|
|
- Approval gates working
|
|
- Autonomy levels configurable
|
|
- Full sprint cycle possible
|
|
|
|
---
|
|
|
|
## Phase 5: Advanced Features (Weeks 19-22)
|
|
**Goal:** Polish and production readiness
|
|
|
|
### 5.1 Cost Management
|
|
- [ ] Real-time cost tracking dashboard
|
|
- [ ] Budget configuration per project
|
|
- [ ] Alert threshold system
|
|
- [ ] Cost optimization recommendations
|
|
- [ ] Historical cost analytics
|
|
|
|
### 5.2 Audit & Compliance
|
|
- [ ] Comprehensive action logging
|
|
- [ ] Audit trail viewer UI
|
|
- [ ] Export functionality
|
|
- [ ] Retention policy implementation
|
|
- [ ] Compliance report generation
|
|
|
|
### 5.3 Human-Agent Collaboration
|
|
- [ ] Live activity dashboard
|
|
- [ ] Intervention panel (pause, guide, undo)
|
|
- [ ] Agent chat interface
|
|
- [ ] Context inspector
|
|
- [ ] Decision explainer
|
|
|
|
### 5.4 Additional MCP Servers
|
|
- [x] File System MCP directory (`mcp-servers/file-system/`)
|
|
- [x] Code Analysis MCP directory (`mcp-servers/code-analysis/`)
|
|
- [x] CI/CD MCP directory (`mcp-servers/cicd/`)
|
|
- [ ] Implement File System MCP
|
|
- [ ] Implement Code Analysis MCP
|
|
- [ ] Implement CI/CD MCP
|
|
|
|
### Deliverables
|
|
- Production-ready system
|
|
- Full observability
|
|
- Cost controls active
|
|
- Audit compliance
|
|
|
|
---
|
|
|
|
## Phase 6: Polish & Launch (Weeks 23-24)
|
|
**Goal:** Production deployment
|
|
|
|
### 6.1 Performance Optimization
|
|
- [ ] Load testing
|
|
- [ ] Query optimization
|
|
- [ ] Caching optimization
|
|
- [ ] Memory profiling
|
|
|
|
### 6.2 Security Hardening
|
|
- [ ] Security audit
|
|
- [ ] Penetration testing
|
|
- [ ] Secrets management
|
|
- [ ] Rate limiting tuning
|
|
|
|
### 6.3 Documentation
|
|
- [ ] User documentation
|
|
- [ ] API documentation
|
|
- [ ] Deployment guide
|
|
- [ ] Runbook
|
|
|
|
### 6.4 Deployment
|
|
- [ ] Production environment setup
|
|
- [ ] Monitoring & alerting
|
|
- [ ] Backup & recovery
|
|
- [ ] Launch checklist
|
|
|
|
---
|
|
|
|
## Current Progress Summary
|
|
|
|
| Phase | Status | Completion |
|
|
|-------|--------|------------|
|
|
| Phase 0: Foundation | ✅ Complete | 100% |
|
|
| Phase 1: Core Platform | ✅ Complete | 100% |
|
|
| Phase 2: MCP Integration | 📋 Not Started | 0% |
|
|
| Phase 3: Agent Orchestration | 📋 Not Started | 0% |
|
|
| Phase 4: Workflow Engine | 📋 Not Started | 0% |
|
|
| Phase 5: Advanced Features | 📋 Not Started | 0% |
|
|
| Phase 6: Polish & Launch | 📋 Not Started | 0% |
|
|
|
|
### Phase 1 Breakdown (All Complete)
|
|
- Data Model: ✅ 100% (all entities, CRUD, migrations)
|
|
- API Layer: ✅ 100% (all endpoints implemented)
|
|
- Real-time: ✅ 100% (EventBus, SSE, client hooks)
|
|
- Frontend Foundation: ✅ 100% (all implementations merged)
|
|
- Main Dashboard & Onboarding: ✅ 100% (dashboard + wizard complete)
|
|
|
|
### Next Steps
|
|
1. **Phase 2**: Implement MCP servers (LLM Gateway, Knowledge Base, Git, Issues)
|
|
2. **Phase 3**: Agent orchestration and inter-agent communication
|
|
3. **Phase 4**: Workflow engine with approval gates
|
|
|
|
---
|
|
|
|
## Risk Register
|
|
|
|
| Risk | Impact | Probability | Mitigation |
|
|
|------|--------|-------------|------------|
|
|
| LLM API outages | High | Medium | Multi-provider failover |
|
|
| Cost overruns | High | Medium | Budget enforcement, local models |
|
|
| Agent hallucinations | High | Medium | Approval gates, code review |
|
|
| Performance bottlenecks | Medium | Medium | Load testing, caching |
|
|
| Integration failures | Medium | Low | Contract testing, mocks |
|
|
|
|
---
|
|
|
|
## Success Metrics
|
|
|
|
| Metric | Target | Measurement |
|
|
|--------|--------|-------------|
|
|
| Agent task success rate | >90% | Completed tasks / total tasks |
|
|
| API response time (P95) | <200ms | Pure API latency (per NFR-101) |
|
|
| Agent response time | <10s simple, <60s code | End-to-end including LLM (per NFR-103) |
|
|
| Cost per project | <$100/sprint | LLM + compute costs (with Opus 4.5 pricing) |
|
|
| Time to first commit | <1 hour | From requirements to PR |
|
|
| Client satisfaction | >4/5 | Post-sprint survey |
|
|
| Concurrent projects | 10+ | Active projects in parallel |
|
|
| Concurrent agents | 50+ | Agent instances running |
|
|
|
|
---
|
|
|
|
## Dependencies
|
|
|
|
```
|
|
Phase 0 ─────▶ Phase 1 ─────▶ Phase 2 ─────▶ Phase 3 ─────▶ Phase 4 ─────▶ Phase 5 ─────▶ Phase 6
|
|
Foundation Core Platform MCP Integration Agent Orch Workflows Advanced Launch
|
|
✅ ✅ 📋 📋 📋 📋 📋
|
|
```
|
|
|
|
---
|
|
|
|
## Resource Requirements
|
|
|
|
### Development Team
|
|
- 1 Backend Engineer (Python/FastAPI)
|
|
- 1 Frontend Engineer (React/Next.js)
|
|
- 0.5 DevOps Engineer
|
|
- 0.25 Product Manager
|
|
|
|
### Infrastructure
|
|
- PostgreSQL (managed or self-hosted)
|
|
- Redis (managed or self-hosted)
|
|
- Celery workers (4-8 instances across 4 queues: agent, git, sync, cicd)
|
|
- MCP servers (7 containers, deployed in Phase 2 + Phase 5)
|
|
- API server (2+ instances)
|
|
- Frontend (static hosting or SSR)
|
|
|
|
### External Services
|
|
- Anthropic API (Claude Opus 4.5 - primary reasoning)
|
|
- OpenAI API (GPT 5.1 Codex max - code generation)
|
|
- Google API (Gemini 3 Pro/Flash - multimodal, fast)
|
|
- Alibaba API (Qwen3-235B - cost-effective, or self-host)
|
|
- DeepSeek V3.2 (self-hosted, open weights)
|
|
- Gitea/GitHub/GitLab (issue tracking)
|
|
|
|
---
|
|
|
|
*Last updated: 2025-12-31*
|