forked from cardosofelipe/fast-next-template
Added 7 new Architecture Decision Records completing the full set: - ADR-008: Knowledge Base and RAG (pgvector) - ADR-009: Agent Communication Protocol (structured messages) - ADR-010: Workflow State Machine (transitions + PostgreSQL) - ADR-011: Issue Synchronization (webhook-first + polling) - ADR-012: Cost Tracking (LiteLLM callbacks + Redis budgets) - ADR-013: Audit Logging (hash chaining + tiered storage) - ADR-014: Client Approval Flow (checkpoint-based) Added comprehensive ARCHITECTURE.md that: - Summarizes all 14 ADRs in decision matrix - Documents full system architecture with diagrams - Explains all component interactions - Details technology stack with self-hostability guarantee - Covers security, scalability, and deployment Updated IMPLEMENTATION_ROADMAP.md to mark Phase 0 completed items. 🤖 Generated with [Claude Code](https://claude.com/claude-code) Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
345 lines
9.5 KiB
Markdown
345 lines
9.5 KiB
Markdown
# Syndarix Implementation Roadmap
|
|
|
|
**Version:** 1.0
|
|
**Date:** 2025-12-29
|
|
**Status:** Draft
|
|
|
|
---
|
|
|
|
## Executive Summary
|
|
|
|
This roadmap outlines the phased implementation approach for Syndarix, prioritizing foundational infrastructure before advanced features. Each phase builds upon the previous, with clear milestones and deliverables.
|
|
|
|
---
|
|
|
|
## Phase 0: Foundation (Weeks 1-2)
|
|
**Goal:** Establish development infrastructure and basic platform
|
|
|
|
### 0.1 Repository Setup
|
|
- [x] Fork PragmaStack to Syndarix
|
|
- [x] Create spike backlog in Gitea (12 issues)
|
|
- [x] Complete architecture documentation
|
|
- [x] Complete all spike research (SPIKE-001 through SPIKE-012)
|
|
- [x] Create all ADRs (ADR-001 through ADR-014)
|
|
- [x] Rebrand codebase (all URLs, names, configs updated)
|
|
- [ ] Configure CI/CD pipelines
|
|
- [ ] Set up development environment documentation
|
|
|
|
### 0.2 Core Infrastructure
|
|
- [ ] Configure Redis for cache + pub/sub
|
|
- [ ] Set up Celery worker infrastructure
|
|
- [ ] Configure pgvector extension
|
|
- [ ] Create MCP server directory structure
|
|
- [ ] Set up Docker Compose for local development
|
|
|
|
### Deliverables
|
|
- [x] Fully branded Syndarix repository
|
|
- [x] Complete architecture documentation (ARCHITECTURE.md)
|
|
- [x] All spike research completed (12 spikes)
|
|
- [x] All ADRs documented (14 ADRs)
|
|
- [ ] Working local development environment (Docker Compose)
|
|
- [ ] CI/CD pipeline running tests
|
|
|
|
---
|
|
|
|
## Phase 1: Core Platform (Weeks 3-6)
|
|
**Goal:** Basic project and agent management without LLM integration
|
|
|
|
### 1.1 Data Model
|
|
- [ ] Create Project entity and CRUD
|
|
- [ ] Create AgentType entity and CRUD
|
|
- [ ] Create AgentInstance entity and CRUD
|
|
- [ ] Create Issue entity with external tracker fields
|
|
- [ ] Create Sprint entity and CRUD
|
|
- [ ] Database migrations with Alembic
|
|
|
|
### 1.2 API Layer
|
|
- [ ] Project management endpoints
|
|
- [ ] Agent type configuration endpoints
|
|
- [ ] Agent instance management endpoints
|
|
- [ ] Issue CRUD endpoints
|
|
- [ ] Sprint management endpoints
|
|
|
|
### 1.3 Real-time Infrastructure
|
|
- [ ] Implement EventBus with Redis Pub/Sub
|
|
- [ ] Create SSE endpoint for project events
|
|
- [ ] Implement event types enum
|
|
- [ ] Add keepalive mechanism
|
|
- [ ] Client-side SSE handling
|
|
|
|
### 1.4 Frontend Foundation
|
|
- [ ] Project dashboard page
|
|
- [ ] Agent configuration UI
|
|
- [ ] Issue list and detail views
|
|
- [ ] Real-time activity feed component
|
|
- [ ] Basic navigation and layout
|
|
|
|
### Deliverables
|
|
- CRUD operations for all core entities
|
|
- Real-time event streaming working
|
|
- Basic admin UI for configuration
|
|
|
|
---
|
|
|
|
## Phase 2: MCP Integration (Weeks 7-10)
|
|
**Goal:** Build MCP servers for external integrations
|
|
|
|
### 2.1 MCP Client Infrastructure
|
|
- [ ] Create MCPClientManager class
|
|
- [ ] Implement server registry
|
|
- [ ] Add connection management with reconnection
|
|
- [ ] Create tool call routing
|
|
|
|
### 2.2 LLM Gateway MCP (Priority 1)
|
|
- [ ] Create FastMCP server structure
|
|
- [ ] Implement LiteLLM integration
|
|
- [ ] Add model group routing
|
|
- [ ] Implement failover chain
|
|
- [ ] Add cost tracking callbacks
|
|
- [ ] Create token usage logging
|
|
|
|
### 2.3 Knowledge Base MCP (Priority 2)
|
|
- [ ] Create pgvector schema for embeddings
|
|
- [ ] Implement document ingestion pipeline
|
|
- [ ] Create chunking strategies (code, markdown, text)
|
|
- [ ] Implement semantic search
|
|
- [ ] Add hybrid search (vector + keyword)
|
|
- [ ] Per-project collection isolation
|
|
|
|
### 2.4 Git MCP (Priority 3)
|
|
- [ ] Create Git operations wrapper
|
|
- [ ] Implement clone, commit, push operations
|
|
- [ ] Add branch management
|
|
- [ ] Create PR operations
|
|
- [ ] Add Gitea API integration
|
|
- [ ] Implement GitHub/GitLab adapters
|
|
|
|
### 2.5 Issues MCP (Priority 4)
|
|
- [ ] Create issue sync service
|
|
- [ ] Implement Gitea issue operations
|
|
- [ ] Add GitHub issue adapter
|
|
- [ ] Add GitLab issue adapter
|
|
- [ ] Implement bi-directional sync
|
|
- [ ] Create conflict resolution logic
|
|
|
|
### Deliverables
|
|
- 4 working MCP servers
|
|
- LLM calls routed through gateway
|
|
- RAG search functional
|
|
- Git operations working
|
|
- Issue sync with external trackers
|
|
|
|
---
|
|
|
|
## Phase 3: Agent Orchestration (Weeks 11-14)
|
|
**Goal:** Enable agents to perform autonomous work
|
|
|
|
### 3.1 Agent Runner
|
|
- [ ] Create AgentRunner class
|
|
- [ ] Implement context assembly
|
|
- [ ] Add memory management (short-term, long-term)
|
|
- [ ] Implement action execution
|
|
- [ ] Add tool call handling
|
|
- [ ] Create agent error handling
|
|
|
|
### 3.2 Agent Orchestrator
|
|
- [ ] Implement spawn_agent method
|
|
- [ ] Create terminate_agent method
|
|
- [ ] Implement send_message routing
|
|
- [ ] Add broadcast functionality
|
|
- [ ] Create agent status tracking
|
|
- [ ] Implement agent recovery
|
|
|
|
### 3.3 Inter-Agent Communication
|
|
- [ ] Define message format schema
|
|
- [ ] Implement message persistence
|
|
- [ ] Create message routing logic
|
|
- [ ] Add @mention parsing
|
|
- [ ] Implement priority queues
|
|
- [ ] Add conversation threading
|
|
|
|
### 3.4 Background Task Integration
|
|
- [ ] Create Celery task wrappers
|
|
- [ ] Implement progress reporting
|
|
- [ ] Add task chaining for workflows
|
|
- [ ] Create agent queue routing
|
|
- [ ] Implement task retry logic
|
|
|
|
### Deliverables
|
|
- Agents can be spawned and communicate
|
|
- Agents can call MCP tools
|
|
- Background tasks for long operations
|
|
- Agent activity visible in real-time
|
|
|
|
---
|
|
|
|
## Phase 4: Workflow Engine (Weeks 15-18)
|
|
**Goal:** Implement structured workflows for software delivery
|
|
|
|
### 4.1 State Machine Foundation
|
|
- [ ] Create workflow state machine base
|
|
- [ ] Implement state persistence
|
|
- [ ] Add transition validation
|
|
- [ ] Create state history logging
|
|
- [ ] Implement compensation patterns
|
|
|
|
### 4.2 Core Workflows
|
|
- [ ] Requirements Discovery workflow
|
|
- [ ] Architecture Spike workflow
|
|
- [ ] Sprint Planning workflow
|
|
- [ ] Story Implementation workflow
|
|
- [ ] Sprint Demo workflow
|
|
|
|
### 4.3 Approval Gates
|
|
- [ ] Create approval checkpoint system
|
|
- [ ] Implement approval UI components
|
|
- [ ] Add notification triggers
|
|
- [ ] Create timeout handling
|
|
- [ ] Implement escalation logic
|
|
|
|
### 4.4 Autonomy Levels
|
|
- [ ] Implement FULL_CONTROL mode
|
|
- [ ] Implement MILESTONE mode
|
|
- [ ] Implement AUTONOMOUS mode
|
|
- [ ] Create autonomy configuration UI
|
|
- [ ] Add per-action approval overrides
|
|
|
|
### Deliverables
|
|
- Structured workflows executing
|
|
- Approval gates working
|
|
- Autonomy levels configurable
|
|
- Full sprint cycle possible
|
|
|
|
---
|
|
|
|
## Phase 5: Advanced Features (Weeks 19-22)
|
|
**Goal:** Polish and production readiness
|
|
|
|
### 5.1 Cost Management
|
|
- [ ] Real-time cost tracking dashboard
|
|
- [ ] Budget configuration per project
|
|
- [ ] Alert threshold system
|
|
- [ ] Cost optimization recommendations
|
|
- [ ] Historical cost analytics
|
|
|
|
### 5.2 Audit & Compliance
|
|
- [ ] Comprehensive action logging
|
|
- [ ] Audit trail viewer UI
|
|
- [ ] Export functionality
|
|
- [ ] Retention policy implementation
|
|
- [ ] Compliance report generation
|
|
|
|
### 5.3 Human-Agent Collaboration
|
|
- [ ] Live activity dashboard
|
|
- [ ] Intervention panel (pause, guide, undo)
|
|
- [ ] Agent chat interface
|
|
- [ ] Context inspector
|
|
- [ ] Decision explainer
|
|
|
|
### 5.4 Additional MCP Servers
|
|
- [ ] File System MCP
|
|
- [ ] Code Analysis MCP
|
|
- [ ] CI/CD MCP
|
|
|
|
### Deliverables
|
|
- Production-ready system
|
|
- Full observability
|
|
- Cost controls active
|
|
- Audit compliance
|
|
|
|
---
|
|
|
|
## Phase 6: Polish & Launch (Weeks 23-24)
|
|
**Goal:** Production deployment
|
|
|
|
### 6.1 Performance Optimization
|
|
- [ ] Load testing
|
|
- [ ] Query optimization
|
|
- [ ] Caching optimization
|
|
- [ ] Memory profiling
|
|
|
|
### 6.2 Security Hardening
|
|
- [ ] Security audit
|
|
- [ ] Penetration testing
|
|
- [ ] Secrets management
|
|
- [ ] Rate limiting tuning
|
|
|
|
### 6.3 Documentation
|
|
- [ ] User documentation
|
|
- [ ] API documentation
|
|
- [ ] Deployment guide
|
|
- [ ] Runbook
|
|
|
|
### 6.4 Deployment
|
|
- [ ] Production environment setup
|
|
- [ ] Monitoring & alerting
|
|
- [ ] Backup & recovery
|
|
- [ ] Launch checklist
|
|
|
|
---
|
|
|
|
## Risk Register
|
|
|
|
| Risk | Impact | Probability | Mitigation |
|
|
|------|--------|-------------|------------|
|
|
| LLM API outages | High | Medium | Multi-provider failover |
|
|
| Cost overruns | High | Medium | Budget enforcement, local models |
|
|
| Agent hallucinations | High | Medium | Approval gates, code review |
|
|
| Performance bottlenecks | Medium | Medium | Load testing, caching |
|
|
| Integration failures | Medium | Low | Contract testing, mocks |
|
|
|
|
---
|
|
|
|
## Success Metrics
|
|
|
|
| Metric | Target | Measurement |
|
|
|--------|--------|-------------|
|
|
| Agent task success rate | >90% | Completed tasks / total tasks |
|
|
| Response time (P95) | <2s | API latency |
|
|
| Cost per project | <$50/sprint | LLM + compute costs |
|
|
| Time to first commit | <1 hour | From requirements to PR |
|
|
| Client satisfaction | >4/5 | Post-sprint survey |
|
|
|
|
---
|
|
|
|
## Dependencies
|
|
|
|
```
|
|
Phase 0 ─────▶ Phase 1 ─────▶ Phase 2 ─────▶ Phase 3 ─────▶ Phase 4 ─────▶ Phase 5 ─────▶ Phase 6
|
|
Foundation Core Platform MCP Integration Agent Orch Workflows Advanced Launch
|
|
│
|
|
│
|
|
Depends on:
|
|
- LLM Gateway
|
|
- Knowledge Base
|
|
- Real-time events
|
|
```
|
|
|
|
---
|
|
|
|
## Resource Requirements
|
|
|
|
### Development Team
|
|
- 1 Backend Engineer (Python/FastAPI)
|
|
- 1 Frontend Engineer (React/Next.js)
|
|
- 0.5 DevOps Engineer
|
|
- 0.25 Product Manager
|
|
|
|
### Infrastructure
|
|
- PostgreSQL (managed or self-hosted)
|
|
- Redis (managed or self-hosted)
|
|
- Celery workers (2-4 instances)
|
|
- MCP servers (7 containers)
|
|
- API server (2+ instances)
|
|
- Frontend (static hosting or SSR)
|
|
|
|
### External Services
|
|
- Anthropic API (primary LLM)
|
|
- OpenAI API (fallback)
|
|
- Ollama (local models, optional)
|
|
- Gitea/GitHub/GitLab (issue tracking)
|
|
|
|
---
|
|
|
|
*This roadmap will be refined as spikes complete and requirements evolve.*
|